Building Construction Performance
Specification of building construction materials applied
item floors walls ceiling
bedroomlaminated parquetlatex latex
sitting room laminated parquet latex latex
bath room + wc terracottafaience latex
kitchen terracotta faience up to 2,10m latex
antre laminated parquet latex latex
common parts terracotta latex latex
terraceterracottaTerranova® Terranova®
restaurantlaminated parquet latex hanged AMF
fitness room rubber cover latexhanged AMF
garagestone plateslatexlatex


Individual Requests

  • the actual size of the apartments shown in apartment plans might be changed and tailored to the actual needs of the Buyer
  • interior migt be changed at request within the limits of the construction
  • constructive materials might be changed at request
  • some special constructive materials and equipment might be applied, for ex. colors of the interior, electric or electronic gadgets etc.
Construction Time frame
Construction began October 2005

All building construction works finalized in June 2006

Operational since 15 July 2006
Apartments are sold finished
finished means:
  • light bodies, switches, plugs operational, standard performance;
  • bathroom fully equiped and operational;
  • hot and drinkable water available;
  • door locks & keys;
  • optional furnishing available at request (samples to be published)
© 2006 sunnybayestatebg.com
Web design, development and support by Intersoft Ltd.